Ashford Hill with Headley

During the past winter storms a well used footbridge collapsed due to bank erosion used to connected footpaths 714 and 715. Natural England, who manages the up keep of the meadows, has been looking for a suitable period when to replace the bridge.  This summer thanks to the long dry period has permitted them to bring in the heavy machinary required to install the new bridge.

This will close in 24 seconds